TY - JOUR T1 - Inspection Qualification (IQ) and Operational Qualification (OQ) for a Vacuum Freeze-Dryer—Part II: Inspection Qualification JF - PDA Journal of Pharmaceutical Science and Technology JO - PDA J Pharm Sci Technol SP - 205 LP - 212 VL - 50 IS - 4 AU - T. A. Jennings AU - A. Scheer AU - A. Emodi AU - L. Puderbach AU - S. King AU - T. Norton Y1 - 1996/07/01 UR - http://journal.pda.org/content/50/4/205.abstract N2 - This paper demonstrates the importance of the inspection qualification (IQ). It was shown that the facilities were adequate to house the dryer and its associated instrumentation, and that the facilities had sufficient utilities to operate the dryer. The IQ established that the design and construction of the dryer was in agreement with the proposed hardware and design specifications. It was verified that the dryer was constructed in accordance with specifications set-forth by the equipment manufacturer. ER -