TABLE VIII

Prepulsing (Steam Addition and Air Removal) Time and Heating Time for “Max Load 2” and “Min Load 2”

PhaseStepMax Load Time (m:ss)Min Load (m:ss)
Run 1Run 2Run 3Run 1Run 2Run 3
Preconditioning/Air RemovalPulse 11st rise (steam injection)1:221:211:221:211:221:22
1st fall (vacuum drawing)7:208:076:585:484:273:59
Vacuum hold4:004:004:004:004:004:00
Pulse 22nd rise (steam injection)1:391:401:401:381:401:40
2nd fall (vacuum drawing)6:547:186:225:324:364:00
Vacuum hold4:004:004:004:004:004:00
Pulse 33rd rise (steam injection)1:491:501:491:471:501:49
3rd fall (vacuum drawing)6:356:396:055:244:364:11
Vacuum hold4:004:004:004:004:004:00
Pulse 44th rise (steam injection)1:581:591:591:581:591:59
4th fall (vacuum drawing)6:506:546:175:224:374:14
Vacuum hold4:004:004:004:004:004:00
Pulse 55th rise (steam injection)2:092:102:102:072:092:09
5th fall (vacuum drawing)6:066:116:075:144:414:14
Vacuum hold4:004:004:004:004:004:00
Heating (prior to sterilization hold phase)9:389:339:439:399:459:43
  • m, Minute. ss, second second.