Recipe Used for the Garment Load
Phase | Parameter | Control Strategya |
---|---|---|
Preparation | Timed vacuum | P = 0.1 bar, time = 5.0 min |
Prepulsing | Steam addition rate | P0 = 0.1 bar |
Pfinal = 1.0 bar | ||
dP/dt = 20 mbar/2 sec | ||
Pressure level increase = 0.1 bar | ||
Vacuum rate | P0 = 1.0 bar | |
Pfinal = 0.1 bar | ||
dP/dt = 20 mbar/2 sec | ||
Falling pulse level increase = 0.0 bar | ||
Vacuum hold after every pulse | Time = 3 min | |
P = 0.1 bar | ||
Number of pre-pulses | 5 | |
Heating (prior to sterilization hold phase) | Temperature | Tfinal = 121.6°C |
dP/dt = 7 mbar/2 sec |
↵a P is pressure, T is temperature, t is time.