TABLE V

Recipe Used for the Garment Load

PhaseParameterControl Strategya
PreparationTimed vacuumP = 0.1 bar, time = 5.0 min
PrepulsingSteam addition rateP0 = 0.1 bar
Pfinal = 1.0 bar
dP/dt = 20 mbar/2 sec
Pressure level increase = 0.1 bar
Vacuum rateP0 = 1.0 bar
Pfinal = 0.1 bar
dP/dt = 20 mbar/2 sec
Falling pulse level increase = 0.0 bar
Vacuum hold after every pulseTime = 3 min
P = 0.1 bar
Number of pre-pulses5
Heating (prior to sterilization hold phase)TemperatureTfinal = 121.6°C
dP/dt = 7 mbar/2 sec
  • a P is pressure, T is temperature, t is time.