TABLE VII

Prepulsing (Steam Addition and Air Removal) Time and Heating Time for “Max Load 1” and “Min Load 1”

PhaseStepMax Load Time (m:ss)Min Load (m:ss)
Run 1Run 2Run 3Run 1Run 2Run 3
Preconditioning/Air RemovalPulse 11st rise (steam injection)1:211:211:221:221:221:22
1st fall (vacuum drawing)8:548:398:194:495:274:24
Vacuum hold3:003:003:003:003:003:00
Pulse 22nd rise (steam injection)1:411:401:421:411:381:41
2nd fall (vacuum drawing)8:068:026:584:355:254:24
Vacuum hold3:003:003:003:003:003:00
Pulse 33rd rise (steam injection)1:501:501:501:491:481:51
3rd fall (vacuum drawing)7:037:406:444:315:394:32
Vacuum hold3:003:003:003:003:003:00
Pulse 44th rise (steam injection)1:592:011:591:592:002:00
4th fall (vacuum drawing)6:517:196:284:285:394:36
Vacuum hold3:003:003:003:003:003:00
Pulse 55th rise (steam injection)2:092:112:092:092:102:11
5th fall (vacuum drawing)6:336:496:234:375:284:34
Vacuum hold3:003:003:003:003:003:00
Heating (prior to sterilization hold phase)9:409:449:419:409:449:47
  • m, Minute. ss, second second.