VIIb.

Negative Control Tests, with and without NIST Airflow Leaks

Package IDPackage DescriptionTest DayMicrocalibrator Leak (cc/min)Abs P (mbar)Diff P (Pa)
2-1 to 2-5Negative controls, empty packages10.0001.4–1.934–46
20.0001.0–1.632–44
10.0502.3–2.970–72
20.0502.0–2.667–74
2-1Negative control, empty package10.1003.3100 (cycle aborted 56.42 s)1
  • 1 Differential pressure reference limit was exceeded and test cycle was aborted at test cycle time indicated.