TABLE III

Estimate of Posterior Probability for a Future Batch Produced after a Successful Stage 2 PPQ To Pass Potency Specification

ProcessPrior DistributionPosterior Probability
1B (1.5, 25)15.3%
2B (25, 1.5)94.9%
3B (1, 1)80.0%