TABLE I

RO Water Quality in the Storage Tank

A. Microbiological & Chemical Quality

Chemical Disinfection Dilution Rate & Disinfection TimeSampling Before/After DisinfectionColony counts(CFU/100mL)Endotoxin (EU/mL)pH*Water Hardness (ppm CaCO3)Conductivity (μS/cm)*Chloride (mg/L)Iron (mg/L)Maintenance of Expendable Parts
R2A (20 or 30 °C, 7 days)SCDA (35 °C, 48 h)AC FilterROIE ResinsUFMFUV Lamp
2006 DecInstallation of washer-disinfector (WD) & reverse osmosis (RO) plant.
n.d. (not done)27n.d.8.8001.290.6<0.01
2007 Jann.d.2.5 × 103n.d.8.5301.630<0.01
2007 FebSignificant contamination of and replacement of the water storage tank. Installation of additional filters and UV treatment lamps.
The new storage tank was equipped with a sampling port and water drainage system.
n.d.6n.d.9.2301.170.2<0.01
2008 AugWhole system disinfection started twice a year from August 2008 after the material compatibility of peracetic acid (PAA)-based compound was confirmed in the WD.
1:200, 1 hBeforen.d.188n.d.5.7001.28n.d.n.d.
Aftern.d. (30 °C from 2009 Mar)0n.d.6.9300.54n.d.n.d.
2009 MarWater engineer failed to evaluate chemical water quality before disinfection.
1:200, 1 hBefore12710.083n.d.n.d.n.d.n.d.n.d.
After500.1916.5005.0n.d.n.d.
2009 Jul1:66, 2 hBefore14200.0636.40011.00.2<0.01
After30100.0636.8000.670.2<0.01
2010 Feb1:200, 2 hBefore5420.0527.8501.650.2<0.01
After1500.0837.3401.160.2<0.01
2010 Aug1:200, 2 hBeforen.d.00.0416.8003.70.2<0.01
Aftern.d. (20 °C from Mar 2011)00.0206.9001.080.2<0.01
2011 MarNew water engineer took over the duty from his predecessor in March 2011, and numerous operator errors occurred in the system maintenance.
1:200, 2 hBefore94160.022n.d.n.d.n.d.n.d.n.d.
After93210.0667.9500.840.3<0.01
2011 Jul1:200, 2 hBefore39320.0156.9201.260.2<0.01
After294180.0227.0400.730.5<0.01
2012 Mar1:100, 2 hBefore117100.0136.6401.590.2<0.01
Sampling port was removed from the storage tank. Water was not sampled from the storage tank after the removal of sampling port.
2012 Jul1:200, 2 hBefore3.6 × 10310.0716.6302.380.1<0.01
It came to light that the new water engineer failed to disinfect the water drainage system after taking over the duty. Water was not sampled from the storage tank after chemical disinfection.
  • Values in bold failed to satisfy AMMI TIR34:2007.

  • * Temperature correction was performed at 25 °C. AC, activated charcoal; RO, reverse osmosis; IE, ion exchange; UF, ultrafilter; MF, microfilter; UV, ultraviolet.