Table I

Overview of Performed Drying Cycles (Shelf Temperature, Ts; Chamber Pressure, Pc)

CycleLoadingFreezingPrimary DryingSecondary Drying
Ts (°C)*hold (min)Ts (°C)*ramp (°C/min)hold (min)Ts (°C)*ramp (°C/min)hold (min)Pc (Pa)**Ts (°C)*ramp (°C/min)hold (min)Pc (Pa)**
A560–400.324000.2450010200.236010
B560–400.524000.2450010200.236010
C560–401.524000.2450010200.236010
D***560–401.512000.2450010200.236010
Aggressive560–400.5240100.245005200.23605
Gentle560–400.5240−200.245005200.23605
VIAL (M)560–400.5240100.2450020200.236020
DCS (E)560–400.5240−100.2450010200.236010
LPC (K)560–400.5240−100.245005200.23605
  • * Shelf temperature

  • ** Chamber pressure

  • *** Plus annealing step (after freezing the product down to T= –40 °C, the shelf temperature was ramped to T= –10 °C at a rate of 1 °C/min and held at that temperature for 120 min before ramping back to T= –40 °C at a rate of 1 °C/min and holding for additional 120 min)