TABLE II

Impact of hydration and dehydration on VPHP uptake of autoclaved and nonautoclaved Tubing

Pre-ProcessVPHP Uptake of processed 1.6 mm ID tubing relative to non-autoclaved control (%)
1 Day Post Process2 Days Post Process6 Days Post Process14 Days Post Process
Autoclaved tubing (121°C for 60 min)28 ± 120 ± 137 ± 239 ± 3
Water incubated up to 7 h in autoclaved tubing42 ± 4NTaNTNT
Drying at 130°C for 12 h54 ± 5NTNTNT
Vacuum59 ± 758 ± 669 ± 567 ± 4
  • a NT: Not tested.